Skip to main content
en
nl
fr
de
Main navigation
Stories
Solutions
Cranes
Steelworks
Turnkey projects
Advice and best practices
About
Corporate story
What makes us tick
Contact
Secundary menu
Jobs
News
Subscribe
Social Media Links
Secundary menu
Jobs
News
Subscribe
en
nl
fr
de
TCS
Main navigation
Stories
Solutions
Cranes
Steelworks
Turnkey projects
Advice and best practices
About
Corporate story
What makes us tick
Contact
Stories
Project stories of TCS customers
Filter on:
Category
Category
Turnkey projects
-Industrial Warehouses
-Industrial production units
-One of a kind projects
Steelworks
-Revamping steelworks
-Industrial steelworks
-Architectural steelworks
-Specific steelworks
Cranes
-Crane services
-Crane projects
-Process cranes
-Standard cranes
Tags
Tags
Project management
Plastics industry
Port facilities
Non-ferrous metals
New horizons
Manufacturing
Project management
Quality assurance
Various sectors
Waste treatment
Steel industry
Safety improvement
Railway industry
Machinery industry
Entertainment industry
Chemical industry
Construction industry
Capacity increase
Business continuity
Agro-industry
Custom service
Design
Engineering
Energy industry
Efficiency improvement
Education
Aerospace industry
or
A simple idea with huge benefits
The project dramatically improved productivity
Willy Stevens, Business Unit Manager at Cuijpers Services, Netherlands.
Read more
Reading time
3 minutes
Corda Campus: refurbishing a manufacturing facility
We managed to fully engage all contractors within the construction team
Irina Vassileva, Architect Workplace Consultant at Procos Group
Read more
Reading time
4 minutes
ECLUSE: the largest industrial heat cluster in Europe
The project was completed within a very short time span
Jarne Van Meerbergen, Head of Projects and Modifications at Indaver/SLECO, Doel, Belgium.
Read more
Reading time
3 minutes
The safe way to build steel structures overseas
We make sure that deadlines are met, and quality is high
Dirk Teuwen, Manager of the Steelworks Business Unit at TCS
Read more
Reading time
4 minutes
Construx: dealing with peculiar geometries
Formwork design and functionality can have a significant impact on project costs
Bart Meermans, Plant Manager at Construx Genk, Belgium
Read more
Reading time
4 minutes
Upgrading older cranes to current standards
Assembly conditions were difficult and manoeuvring space was tight
Filip Roelandt, Project manager at Kronos Europe, Ghent (Belgium)
Read more
Reading time
4 minutes
Reorganising infrastructure maintenance
They took care of everything, including the necessary overhead cranes.
Charlotte Ooms, Architect at Antwerp Port Authority, Antwerp (Belgium)
Read more
Reading time
4 minutes
Roba Metals: a family business with vision
Our sustained policy of keeping stocks has helped us remain flexible
Maurice Rothkrantz, Plant Manager Roba Metals Genk (Belgium)
Read more
Reading time
3 minutes
Best-in-class construction material supplier
A portal crane is the most effective solution for moving heavy goods around on our platform.
Jacques Latouche, Properties Director at Bodymat Belgium
Read more
Reading time
4 minutes
Modernising the railway switch factory
The phased approach allowed us to make temporary arrangements for production to continue
Christian Buyst, Maintenance Manager at Infrabel Bascoup (Belgium)
Read more
Reading time
3 minutes
New workshop for insect screen producer Feneko
“Remove my burdens, then we’re in business”
Frank Nees, Director of Feneko Brussels (Belgium)
Read more
Reading time
2 minutes
Biogas plant: getting a grip on inputs and outputs
The challenge was to design and organize a process that is both practical and economical
Francies Van Gijzeghem, CEO of En-Bio
Read more
Reading time
4 minutes
A steel service centre alongside the canal
Our turnkey contractor significantly reduced the hardships for us
Edwin Cramer, Site Manager at LSC Bree (Belgium)
Read more
Reading time
5 minutes
Meticulous co-ordination of construction activities at ArcelorMittal
They not only hired subcontractors but also accepted the associated risks and the responsibility for the co-ordination of the works
Marco Boly, Deputy CEO of ArcelorMittal Centre Logistique Européen at Differdange (Luxemburg)
Read more
Reading time
4 minutes